When you’re picking lintels, start with the opening, the wall build-up and the load above it. That narrows the choice faster than brand or finish. Steel lintels are often used where you want a slimmer section and a lighter lift. Concrete lintels suit straightforward masonry work and are often the economical call on ordinary openings. Cavity lintels, solid wall lintels and replacement lintels each cover a different job, so getting the format right saves delays and returns.
Keystone Lintels S/K-150 - 1500mm
1500mm Keystone lintel for cavity widths 150-165mm
Keystone Lintels S/K-90 - 1650mm
Keystone S/K-90 lintel for cavity widths 90-105 millimetres, 1650 millimetres lo…
Catnic CG90 Cavity Wall Open Back Lintel Standard Duty - 1800mm
1800mm galvanised steel cavity wall open back lintel, standard duty
Catnic CN71A Classic Box Lintel Standard Duty - 1200mm
Galvanised steel standard duty box lintel, 1200mm length, for exterior solid or …
Keystone Lintels SB/K - 2400mm
2400mm SB/K lintel for cavity wall outer leaf support
Keystone HD/K-90 Lintel - 1650mm
1650mm lintel for 90-105mm cavity blockwork walls
IG Single Leaf Internal Lintel - 100 x 1200mm
Steel internal solid wall lintel, 100 millimetres x 1200 millimetres
Keystone Lintels S/K-150 - 2400mm
Lintel for 150-165mm cavity widths, 2400mm length
IG L9 Solid Wall External Lintel - 215 x 1200mm
1200mm galvanised steel external solid wall lintel for 215mm walls
The first question is what the opening is carrying and how much room you’ve got to work with. That usually decides the lintel before anything else. For a straightforward job, concrete lintels are often the economical call. Steel lintels come into play where span, load, or build-up needs a slimmer section. Cavity lintels and solid wall lintels are not interchangeable. Replacement lintels matter on remedial work, where you’re matching what’s already there. The jobs that go wrong are usually the ones where the opening was measured right, but the wall type was guessed.
If you’re sorting lintels for a job, the main split is between cavity lintels, solid wall lintels and heavier load bearing options.
Cavity lintels suit the usual two-leaf build because they keep the support where it needs to be. Solid wall lintels are the better fit for a single leaf or an older wall build-up.
Load bearing lintels come in when the opening is carrying more above it. You give up some simplicity, and you’ll usually check the spec more closely.
Building Supplies is the parent range if you’re matching the lintel to the rest of the job.
Material choice usually settles the argument faster than anything else. Steel lintels are the one to reach for when you want a firmer face and more confidence on tougher daily use. The trade-off is handling. They’re heavier to move than acrylic on many sites.
Concrete lintels are the quieter pick when weight and cost matter more than a harder finish. They work well where the opening does not need the same level of impact resistance, but they are not the answer for every job.
If you’re picking up matching materials at the same time, Aggregates & Chemicals and Brickworking are usually the next counters to check, especially when the opening detail or surrounding work is changing the spec.
Once the lintels are chosen, the next call is usually what’s going around them. If the opening is being rebuilt, you’ll often need brickworking to match the surrounding course work, and aggregates & chemicals for the mortar and any bedding or repair work that follows.
Where the job is a replacement, check the adjacent finish before you leave. A clean lintel change still gets judged on the reveal and the patching around it. That’s the bit that usually decides whether the job looks finished or just covered up.





