When you’re choosing consumer units, start with the circuit layout and the protection the job needs, not just the box itself. A split load board suits circuits on separate RCD protection, while a main switch unit fits simpler boards where the arrangement is handled elsewhere. Metal cases are the usual call where the spec needs a tougher enclosure. Plastic can still work on lighter domestic jobs if that’s what the installation calls for. Check the space before you commit, so the board matches the circuit count and the layout from the start.
Navitas 2 Free Way 100A Mainswitch C/W T2 SPD
2-way consumer unit with 100A mainswitch, T2 SPD, IP4X, steel construction
Eris Consumer Metal Consumer Unit with Connection Kit for Mains Switch & RCD - 8…
Metal consumer unit, 8 module (6 spare ways), with connection kit
Wylex Main Switch Board c/w Main Switch - 23 Way
23-way duplex consumer unit with 100A main switch and metal enclosure
Fusebox Metal Consumer Unit with Dual RCD Main Switch - 7 Way
7 way metal consumer unit, dual 80A 30mA RCDs, white steel
Wylex 9 Way High Integrity Consumer Unit - 100A main switch, 2 x 80A 30mA type A…
9-way high integrity consumer unit with 100A main switch, RCDs, SPD and 8 MCBs
Fusebox 100A Main Switch Only Board 45 Useable Ways - 3 bank
100A main switch consumer unit with 45 usable ways in a 3-bank metal enclosure
Eris Consumer Metal Consumer Unit with Connection Kit for Mains Switch & RCD - 5…
Metal consumer unit with 3 ways, includes mains switch & RCD connection kit
Danson E-MM164/SPD1 Metal Consumer Unit with SPD and 100A Main Switch - 12 Way
12-way metal consumer unit with 100A main switch and SPD
Fusebox 80A RCD Consumer Unit - 17 Way Steel White
80A RCD consumer unit, 17 way unpopulated, steel white enclosure
Niglon DIN Rail Enclosure - 4 Module, Metal, IP20
4-module metal DIN rail enclosure with IP20 rating
You narrow consumer units by the job first. Count the ways you need. Check where it’s going. Then look at the space you’ve actually got in the board position. After that, it usually comes down to the enclosure format, how much spare capacity you want left, and whether you need a domestic consumer unit, a garage consumer unit, or a basic fuse box replacement. The mistake is buying to match the old board, then finding the new layout won’t work cleanly.
Most jobs come down to three calls: how many ways you need, whether you want the board built up or left as a consumer unit enclosure, and how much room you’ve got to work with.
A consumer unit board suits a straightforward replacement when you want the assembly ready to populate. A bare consumer unit enclosure makes more sense if you’re building the board out yourself or replacing like for like on a tight spec.
A garage consumer unit is usually picked for outbuildings because the run and environment are different. It’s still worth checking the layout against the rest of the Power Distribution & Circuit Protection range before you commit. The boards that get changed most often are the ones bought to suit the old unit rather than the circuits going in.
Material is the first call I’d make. A metal consumer unit is usually the pick when you want a tougher enclosure and better resistance to rough handling. A plastic consumer unit is lighter, so it’s easier to carry through tight spaces or awkward access.
That’s the trade-off. Metal feels more substantial. Plastic is easier on the lift. If you’re pricing the rest of the job, don’t forget the bits that go with it - Consumer Unit Accessories often decide whether you finish cleanly or end up back for small parts. For anything beyond a single-phase board, 3 Phase Distribution is the next stop.
Once you’ve picked the board, the next call is what sits around it and what the job needs to look like when you leave. On a tidy replacement, you may only need a few consumer unit accessories and a blanking arrangement to keep the spare ways clean.
If the board is going in a garage or plant area, the enclosure and finish matter more. Knocks, dust and awkward cable entries are what usually cause the call-back. Where the supply arrangement is changing, the next stop is often the matching distribution gear rather than trying to force a standard domestic setup to do a different job.











