When you’re choosing consumer units, start with the circuit layout and the protection the job needs, not just the box itself. A split load board suits circuits on separate RCD protection, while a main switch unit fits simpler boards where the arrangement is handled elsewhere. Metal cases are the usual call where the spec needs a tougher enclosure. Plastic can still work on lighter domestic jobs if that’s what the installation calls for. Check the space before you commit, so the board matches the circuit count and the layout from the start.
Schneider Electric Acti9 Isobar P Distribution Board - 125A 10 Way Type A Cream
125A 10-way distribution board in cream
Click Elucian Consumer Unit
12-way metal consumer unit with 100A mains switch and type 2 SPD, 8 free ways
Wylex Consumer Unit - Metal 2 way 63A MS
Wylex metal 2-way consumer unit rated 63A
Fusebox Consumer Unit - 28 module 23 way (11/12 double bank) with 100A main swit…
Fusebox consumer unit, 28 module, 23 way, with 100A main switch and T2 SPD
Danson Double Stacked Metal Consumer Unit - 26 way (12+14) 100A main switch & 2 …
26-way metal consumer unit with 100A main switch and dual 80A 30mA RCDs
Hager Residual Current Device Configurable Type 2 Split Load Consumer Unit - 100…
Hager configurable Type 2 split load consumer unit, 100 A
Wylex 34 Way Flexible High Integrity Unit NMDRS34HIA - 100A Main Switch & 3 x 80…
34-way high integrity consumer unit, metal enclosure, 100A main switch, 3 RCCBs
BG CFUDP16610-01 10 Way with 100A Switch, 2x 63A 30mA RCDs & 10x MCBs - White - …
BG 10-way consumer unit with 100A switch, 2 RCDs and 10 MCBs, white, 388mm.
Niglon DIN Rail Enclosure - 4 Module, Metal, IP20
4 module metal DIN rail enclosure, IP20, 225 x 110 x 62mm
Eris Consumer Metal Consumer Unit - 10 Module 8 Way 100A Switch
10-module 8-way metal consumer unit with 100A switch and spirit level
You narrow consumer units by the job first. Count the ways you need. Check where it’s going. Then look at the space you’ve actually got in the board position. After that, it usually comes down to the enclosure format, how much spare capacity you want left, and whether you need a domestic consumer unit, a garage consumer unit, or a basic fuse box replacement. The mistake is buying to match the old board, then finding the new layout won’t work cleanly.
Most jobs come down to three calls: how many ways you need, whether you want the board built up or left as a consumer unit enclosure, and how much room you’ve got to work with.
A consumer unit board suits a straightforward replacement when you want the assembly ready to populate. A bare consumer unit enclosure makes more sense if you’re building the board out yourself or replacing like for like on a tight spec.
A garage consumer unit is usually picked for outbuildings because the run and environment are different. It’s still worth checking the layout against the rest of the Power Distribution & Circuit Protection range before you commit. The boards that get changed most often are the ones bought to suit the old unit rather than the circuits going in.
Material is the first call I’d make. A metal consumer unit is usually the pick when you want a tougher enclosure and better resistance to rough handling. A plastic consumer unit is lighter, so it’s easier to carry through tight spaces or awkward access.
That’s the trade-off. Metal feels more substantial. Plastic is easier on the lift. If you’re pricing the rest of the job, don’t forget the bits that go with it - Consumer Unit Accessories often decide whether you finish cleanly or end up back for small parts. For anything beyond a single-phase board, 3 Phase Distribution is the next stop.
Once you’ve picked the board, the next call is what sits around it and what the job needs to look like when you leave. On a tidy replacement, you may only need a few consumer unit accessories and a blanking arrangement to keep the spare ways clean.
If the board is going in a garage or plant area, the enclosure and finish matter more. Knocks, dust and awkward cable entries are what usually cause the call-back. Where the supply arrangement is changing, the next stop is often the matching distribution gear rather than trying to force a standard domestic setup to do a different job.











