When you’re choosing consumer units, start with the circuit layout and the protection the job needs, not just the box itself. A split load board suits circuits on separate RCD protection, while a main switch unit fits simpler boards where the arrangement is handled elsewhere. Metal cases are the usual call where the spec needs a tougher enclosure. Plastic can still work on lighter domestic jobs if that’s what the installation calls for. Check the space before you commit, so the board matches the circuit count and the layout from the start.
Wylex Metal Clad High Integrity Fully Loaded Flexible Configuration Consumer Uni…
10-way high-integrity consumer unit with 100A switch and 80A 30mA RCDs
Danson E-MM044E Metal Consumer Unit Supplied with 100A Main Switch 2 Ways
Metal consumer unit, 2-way with 100A main switch, IP2X
Eris Consumer 6 Module 4 Way Metal Clad Single Phase Consumer Unit
Metal clad 4 way consumer unit, single phase, 230V
Click Elucian 16 Way Metal Consumer Unit with 100A Main Switch & Type 2 SPD
16-way metal consumer unit with 100A main switch, Type 2 SPD, 12 free ways
Schneider Electric Loadcentre KQ 250A 12 Way Distribution Board
250A 12-way distribution board, IP3X, 700x470x139mm
Altrion Dual RCD Consumer Unit - 100A Split Load 4+4 Way
100A dual RCD split load consumer unit, 4+4 way, 18th Edition compliant
BG Metal Shower Consumer Unit IP65 - 2 Way
IP65 metal 2-way shower consumer unit with 63A RCD and MCB, 10-year warranty.
Hager Residual Current Device Type A Split Load Consumer Unit - 5+5 ways, round …
Hager 10-way split load consumer unit with two 100A Type A RCCBs
Wylex 2 Way Amendment 3 Metal RCD Consumer Unit
Wylex 2-way metal consumer unit with 63A 30mA RCD incomer
Hager Split Load High Integrity Consumer Unit Unpopulated - 14 Way, 2 x 100A Typ…
Hager 14 way split load consumer unit, unpopulated, with 2x100A RCDs and SPD.
You narrow consumer units by the job first. Count the ways you need. Check where it’s going. Then look at the space you’ve actually got in the board position. After that, it usually comes down to the enclosure format, how much spare capacity you want left, and whether you need a domestic consumer unit, a garage consumer unit, or a basic fuse box replacement. The mistake is buying to match the old board, then finding the new layout won’t work cleanly.
Most jobs come down to three calls: how many ways you need, whether you want the board built up or left as a consumer unit enclosure, and how much room you’ve got to work with.
A consumer unit board suits a straightforward replacement when you want the assembly ready to populate. A bare consumer unit enclosure makes more sense if you’re building the board out yourself or replacing like for like on a tight spec.
A garage consumer unit is usually picked for outbuildings because the run and environment are different. It’s still worth checking the layout against the rest of the Power Distribution & Circuit Protection range before you commit. The boards that get changed most often are the ones bought to suit the old unit rather than the circuits going in.
Material is the first call I’d make. A metal consumer unit is usually the pick when you want a tougher enclosure and better resistance to rough handling. A plastic consumer unit is lighter, so it’s easier to carry through tight spaces or awkward access.
That’s the trade-off. Metal feels more substantial. Plastic is easier on the lift. If you’re pricing the rest of the job, don’t forget the bits that go with it - Consumer Unit Accessories often decide whether you finish cleanly or end up back for small parts. For anything beyond a single-phase board, 3 Phase Distribution is the next stop.
Once you’ve picked the board, the next call is what sits around it and what the job needs to look like when you leave. On a tidy replacement, you may only need a few consumer unit accessories and a blanking arrangement to keep the spare ways clean.
If the board is going in a garage or plant area, the enclosure and finish matter more. Knocks, dust and awkward cable entries are what usually cause the call-back. Where the supply arrangement is changing, the next stop is often the matching distribution gear rather than trying to force a standard domestic setup to do a different job.











