When you’re choosing consumer units, start with the circuit layout and the protection the job needs, not just the box itself. A split load board suits circuits on separate RCD protection, while a main switch unit fits simpler boards where the arrangement is handled elsewhere. Metal cases are the usual call where the spec needs a tougher enclosure. Plastic can still work on lighter domestic jobs if that’s what the installation calls for. Check the space before you commit, so the board matches the circuit count and the layout from the start.
Eris Consumer 2 Module Metal Enclosure with DIN Rail Only - 154mm x 87mm x 108mm
2-module metal enclosure with DIN rail, 154x87x108mm
Hager 18 Way 100A Main Switch Incomer Consumer Unit Type 2 SPD
18-way 100A main switch consumer unit with Type 2 SPD in white steel enclosure
Eaton Distribution Board - 125A 6 Way Type B
125A 6-way type B distribution board with welded steel case.
Fusebox F3012M 14 Module 12 Way Consumer Unit with 100A Main Switch
12-way unpopulated metal consumer unit with 100A main switch
Fusebox 18 Module 15 Way Consumer Unit with 100A Main Switch & T2 SPD
18-module 15-way consumer unit with 100A main switch and T2 SPD
Fusebox 80A RCD Consumer Unit - 7 Way Steel White
80A RCD 7-way steel consumer unit, white, 259x234x113mm
Danson High Integrity Fully Loaded Consumer Unit with Dual RCDs and Main Switch …
12-way consumer unit with dual RCDs and main switch, IP40, 100A rated
BG Electrical Dual RCD Metal Main Switch Boards with Main Switch - 20 Way
20-way dual RCD metal consumer unit with main switch
MK Sentry Flexible Dual RCD Metal Clad Main Switch K7678SMET 21W Populated Consu…
21-way metal clad consumer unit, populated with dual RCDs and MCBs
Danson 16 Way High Integrity Metal Consumer Unit - Supplied with 100A main switc…
16-way high integrity metal consumer unit, 100A main switch, 2x80A 30mA RCDs, 16…
You narrow consumer units by the job first. Count the ways you need. Check where it’s going. Then look at the space you’ve actually got in the board position. After that, it usually comes down to the enclosure format, how much spare capacity you want left, and whether you need a domestic consumer unit, a garage consumer unit, or a basic fuse box replacement. The mistake is buying to match the old board, then finding the new layout won’t work cleanly.
Most jobs come down to three calls: how many ways you need, whether you want the board built up or left as a consumer unit enclosure, and how much room you’ve got to work with.
A consumer unit board suits a straightforward replacement when you want the assembly ready to populate. A bare consumer unit enclosure makes more sense if you’re building the board out yourself or replacing like for like on a tight spec.
A garage consumer unit is usually picked for outbuildings because the run and environment are different. It’s still worth checking the layout against the rest of the Power Distribution & Circuit Protection range before you commit. The boards that get changed most often are the ones bought to suit the old unit rather than the circuits going in.
Material is the first call I’d make. A metal consumer unit is usually the pick when you want a tougher enclosure and better resistance to rough handling. A plastic consumer unit is lighter, so it’s easier to carry through tight spaces or awkward access.
That’s the trade-off. Metal feels more substantial. Plastic is easier on the lift. If you’re pricing the rest of the job, don’t forget the bits that go with it - Consumer Unit Accessories often decide whether you finish cleanly or end up back for small parts. For anything beyond a single-phase board, 3 Phase Distribution is the next stop.
Once you’ve picked the board, the next call is what sits around it and what the job needs to look like when you leave. On a tidy replacement, you may only need a few consumer unit accessories and a blanking arrangement to keep the spare ways clean.
If the board is going in a garage or plant area, the enclosure and finish matter more. Knocks, dust and awkward cable entries are what usually cause the call-back. Where the supply arrangement is changing, the next stop is often the matching distribution gear rather than trying to force a standard domestic setup to do a different job.











