For fires, stoves & electric heating, the first question is what the job needs to do. You might need a visible flame effect, room heat, or a straight replacement where the existing setup already sets the route. Electric fires suit quicker installs and lighter spec work. Gas fires need the right supply and flue arrangement, so they fit sites that already support them. Stoves bring a different look, but they also mean more weight and more checks on clearances and fuel type.
Osily Tubular Heater with Adjustable Thermostat - 55W 510mm IP44 White
55W tubular heater with adjustable thermostat and IP44 rating
Dimplex Panel Heater - 500W 430mm Lot 20
500W electric panel heater with natural white finish, 430mm wide.
Osily Tubular Heater with Adjustable Thermostat - 90W 710mm White IP44
90W 710mm white tubular heater with thermostat, IP44
Greenbrook Tubular Heater with Re-Settable Thermal Trip - 240W 4ft IP44
240W 4ft tubular heater with IP44 rating and re-settable thermal trip
Dimplex PLXE Panel Heater - 1.0kW
1.0kW Dimplex PLXE panel heater for efficient space heating
Valor Natural Gas Pilot and ODS Assembly
Natural gas pilot and ODS assembly for Valor and BG fires
Osily 60W Tubular Heater with Fixed Thermostat - 310mm total length
Osily 60W tubular heater, fixed thermostat, IP55, 310mm
Hyco Panel Heater - 1.5kW White
1.5kW white panel heater with integrated timer
Mylek Ultra Slim Electric Panel Heater with 24/7 Timer - 350mm x 440mm x 55mm, 5…
Ultra-slim 500W panel heater, IP24, 7-day timer, Lot 20 compliant
Convector Heater with Thermostat - 2kW
2kW convector heater with thermostat
Start with the space you’ve actually got and how the job needs to work, then the rest of the spec usually falls into place. In Plumbing & Heating, the right call on fires, stoves & electric heating usually comes down to footprint, clearances, and whether you’re replacing like for like or building out a feature. A tight opening often points you towards slimmer electric fires. A bigger opening can take a heavier unit or a more substantial stove. Finish and accessories come after that. Size and format are what cause grief on site, not the colour.
If it’s a straight replacement, Fireplaces are usually the cleaner buy. You work to an existing opening and finish, not the whole look around the appliance.
That narrows the choice. Check the opening, the surround, and whether you need a more traditional face or something that sits flush. Electric fires are the easier fit where you want less disruption. Gas fires need the right supply and flue arrangement, so they are not the quick swap people sometimes expect.
If you want a quicker fit with less disruption, Heaters are the narrower buy.
They cover the heat requirement without the same visual impact. That makes them a better fit for straightforward replacements and add-on warmth, rather than a focal point.
Stoves usually come down to two things. What the client wants to see, and what the opening will take.
If you’re replacing like for like, the main call is whether you need a straightforward unit or something heavier that changes the job around it.
A stove gives you more presence than electric fires, but you give up some of the easy-fit simplicity. If the spec is already set, Stoves is the narrower buy within fires, stoves & electric heating. If not, the opening and the fuel arrangement usually decide it first.
The choice in fires, stoves & electric heating usually comes down to what the job can take and the finish the client wants.
Electric fires suit quicker swaps and lighter work. You are not tied into the same supply and flue questions. The trade-off is less presence than you get from a gas fire or a stove.
Gas fires need the right services in place, so they make sense where the spec already supports them. If the job sits within a wider heating scheme, Central Heating is the next check. That can change what you buy before you get near the opening.
Once you’ve picked the main unit, the next call is what finishes the surround and what needs to sit with it on the job.
Panels, screens and wall finishes come in when the opening is being rebuilt or the existing face needs tidying up. Storage and accessories matter when the client wants logs, tools or a cleaner set-up around the appliance.
A lot of call-backs start with the finish being left until last. The opening, trim and appliance should be lined up together.

















