For fires, stoves & electric heating, the first question is what the job needs to do. You might need a visible flame effect, room heat, or a straight replacement where the existing setup already sets the route. Electric fires suit quicker installs and lighter spec work. Gas fires need the right supply and flue arrangement, so they fit sites that already support them. Stoves bring a different look, but they also mean more weight and more checks on clearances and fuel type.
Heat MAT Mirror Demister - 400mm x 450mm
Heat Mat mirror demister, 400mm x 450mm
Airmaster Upright Fan Heater - 2000W
2000W upright fan heater built to German quality standards.
Heat MAT PipeGuard - 4m 53W
Heat Mat PipeGuard, 4 metre length, 53W
ATC Almeria Eco Digital Panel Heater - 500W
ATC Almeria Eco 500W digital panel heater
Hyco Panel Heater - 2.0kW White
2.0kW white panel heater with integrated timer
Wall Mounted Panel Heater with LCD Display - 2kW 20m² 437mm x 1096mm x 145mm Whi…
2kW panel heater for spaces up to 20m² with LCD display and anti-frost function
Frost Watch Heater - 520W
520W frost watch heater with thermostat and overheat protection
Rhino FH2 Fan Heater - 240V 2kW
240 volt 2 kilowatt fan heater, model H02073
Niglon Tubular Heater - 2ft 120W
120W tubular heater, 610mm length
Greenbrook Tubular Heater with Re-settable Thermal Trip - 3ft 180W IP44
3ft 180W IP44 tubular heater with re-settable thermal trip
Start with the space you’ve actually got and how the job needs to work, then the rest of the spec usually falls into place. In Plumbing & Heating, the right call on fires, stoves & electric heating usually comes down to footprint, clearances, and whether you’re replacing like for like or building out a feature. A tight opening often points you towards slimmer electric fires. A bigger opening can take a heavier unit or a more substantial stove. Finish and accessories come after that. Size and format are what cause grief on site, not the colour.
If it’s a straight replacement, Fireplaces are usually the cleaner buy. You work to an existing opening and finish, not the whole look around the appliance.
That narrows the choice. Check the opening, the surround, and whether you need a more traditional face or something that sits flush. Electric fires are the easier fit where you want less disruption. Gas fires need the right supply and flue arrangement, so they are not the quick swap people sometimes expect.
If you want a quicker fit with less disruption, Heaters are the narrower buy.
They cover the heat requirement without the same visual impact. That makes them a better fit for straightforward replacements and add-on warmth, rather than a focal point.
Stoves usually come down to two things. What the client wants to see, and what the opening will take.
If you’re replacing like for like, the main call is whether you need a straightforward unit or something heavier that changes the job around it.
A stove gives you more presence than electric fires, but you give up some of the easy-fit simplicity. If the spec is already set, Stoves is the narrower buy within fires, stoves & electric heating. If not, the opening and the fuel arrangement usually decide it first.
The choice in fires, stoves & electric heating usually comes down to what the job can take and the finish the client wants.
Electric fires suit quicker swaps and lighter work. You are not tied into the same supply and flue questions. The trade-off is less presence than you get from a gas fire or a stove.
Gas fires need the right services in place, so they make sense where the spec already supports them. If the job sits within a wider heating scheme, Central Heating is the next check. That can change what you buy before you get near the opening.
Once you’ve picked the main unit, the next call is what finishes the surround and what needs to sit with it on the job.
Panels, screens and wall finishes come in when the opening is being rebuilt or the existing face needs tidying up. Storage and accessories matter when the client wants logs, tools or a cleaner set-up around the appliance.
A lot of call-backs start with the finish being left until last. The opening, trim and appliance should be lined up together.

















